Active landfill faces generate fine particulate from every load that goes over the working face, every dozer pass that spreads cover material, and every wind event that lifts dry material off the cell surface. The water truck is not optional at a regulated landfill. It is part of the facility's air quality operating permit, and the regulator that issued that permit will inspect for visible dust control. An active cell without a water truck running is a permit violation in progress.
Remediation contractors have a related but distinct set of water truck needs. Excavating contaminated soil, demolishing structures with asbestos or lead paint, or grading a Superfund site all create regulated dust control obligations under the project's remediation action plan. The truck has to be compatible with the contamination type, the spray system has to deliver the required application rate, and the operator has to document water use for the site record. We finance water trucks for both landfill operations and environmental remediation from $50,000 up, new or used. Recent operating statements and the short application. B and C credit is fine. We close in about two weeks.

